Heavy equipment machinery information about  Articulated Trucks,Excavator, Bulldozer
Home  |  Heavy Machinery Classifieds  |  Partner Resources  |  Site Map
Categories
Search


Advanced Search
Article Options
Popular Articles
  1. Rotary Tiller Service Manual
  2. The Fonly Drilling Machine
  3. All About Heavy Machinery: Earth Movers
  4. Self-cleaning ejector articulated truck
  5. Hydraulic Breakers: Better Than Ever At Bustin' Hard Stuff
No popular articles found.
Popular Authors
  1. Article Admin
  2. super admin
  3. News Department
  4. Alexei Timchuk
  5. vinay kumar
  6. fiefrasutouri fiefrasutouri
  7. Hiepenvig Hiepenvig
No popular authors found.
 »  Home  »  Material Handlers  »  AUTOMATED MATERIAL HANDLING EQUIPMENT
AUTOMATED MATERIAL HANDLING EQUIPMENT
By super admin | Published  08/19/2008 | Material Handlers | Unrated
"AUTOMATED MATERIAL HANDLING EQUIPMENT
Automated material handling equipment systems have been around in one form or another since the 1950's. Different degrees of automation success have been achieved in a variety of applications. Horror stories as well as truly excellent installations abound, sometimes within the same company. How do you go about the process of evaluating automation?

GETTING STARTED

First determine which material handling operations should be considered for automation.

- Receiving?
- Putaway?
- Replenishment?
- Picking?
- Shipping?

After you have decided which material handling operations are candidates for automation, develop a database of operating histories and requirements for the operations you are considering. Automation should only be considered if the stability of the following factors is predictable:

a. Corporate structure
b. Operating requirements
c. Order characteristics
d. Unit load size
e. Carton size
f. Location network configuration

WHEN PROPERLY ANALYZED AND IMPLEMENTED, AN AUTOMATED MATERIAL HANDLING SYSTEM CAN GIVE YOUR COMPANY A COMPETITIVE EDGE.

If you cannot project a "stable state" for the operation, automation becomes much riskier.

DEFINE SYSTEM REQUIREMENTS

The process of defining what you want the system to accomplish is probably the most tedious task in the process. If you cannot define the system requirements for a particular task you are trying to automate, stop and reconsider automation. You cannot automate what you cannot define. Include your management’s payback hurdle rate as part of the system definition.

VISIT SIMILAR APPLICATIONS

When you have defined the system, approach three or four qualified material handling equipment vendors. Familiarize these vendors with your system requirements and ask them to arrange for site visits and telephone conversations with installed users. If a vendor cannot arrange for you to visit a satisfied user, reconsider using this vendor’s system.

OBTAIN DETAILED BIDS

After you have "qualified" the appropriate vendors, request detailed bid packages from them. In addition to prices, these bid packages should include detailed drawings, information system support requirements, system capacities, installation schedules, start-up assistance required and provided, acceptance test procedures, service agreements and warranties.

EVALUATE THE BID PACKAGE

The process of evaluating the bid packages must be approached very carefully. The vendors will have spent considerable time, effort and money preparing these packages. Your company is going to spend considerable time, effort and money implementing the automated material handling equipment system if it decides to proceed.

A system that does not work properly will not only not improve your operations, but may, in fact, impede them. Therefore, selecting a vendor based solely on price is asking for trouble.

The financial stability and reputation of the vendor and of any subcontractors they plan to use should be high on the list of evaluation points. Before making a final decision, the system should be thoroughly tested using computer simulation. The simulation should be prepared by an independent party - not by the vendor.

IMPLEMENTING THE AUTOMATED SYSTEM

When the process of choosing a vendor has been completed, the real implementation work begins. Insist on close coordination between your project team, your software development team, and the vendor's team. Treat the vendor's team as a partner. Establish a detailed implementation schedule immediately and monitor it closely during the entire process. Insist on definable milestones for hardware and for any associated software development.

Prior to start-up, detailed procedures must be written and your software must be documented and tested. Detailed procedures will be the basis for training the personnel involved in using the new automated system. Proper training is the key to success at this point.

Documentation and testing of your software should focus on the elements which drive the mechanical controls as well as those which provide information to the system. Make sure you receive complete system documentation from the vendor. Prepare a good test plan with clear predicted results. Allow sufficient time to complete adequate testing procedures.

After the acceptance test and shakedown period are over, an assessment should be made of how to make the new automated system more effective for your operation. Note any changes needed and obtain vendor’s agreement to make them.



http://www.grossassociates.com/articles/mathand.htm



For more information visit Material Handlers category

How would you rate the quality of this article?
1 2 3 4 5
Poor Excellent
Verification:
Enter the security code shown below:
imgRegenerate Image


Heavy Machinery  |  Heavy Machinery Classifieds  |  CNC Machines   |  Water Purification System   |  Partner Resources  |   Site Map

  Add to Google Reader or Homepage  Add to My AOL